<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>VPower Solutions &#187; 2014</title>
	<atom:link href="https://vpower.com.sg/category/news/2014/feed/" rel="self" type="application/rss+xml" />
	<link>https://vpower.com.sg</link>
	<description>ETap Authorised Representative</description>
	<lastBuildDate>Mon, 13 Jun 2022 03:21:42 +0000</lastBuildDate>
	<language>en-US</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=3.8.41</generator>
	<item>
		<title>Software Training 2013 &amp; 2014</title>
		<link>https://vpower.com.sg/news/2014-software-training/</link>
		<comments>https://vpower.com.sg/news/2014-software-training/#comments</comments>
		<pubDate>Wed, 14 Sep 2016 06:48:50 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[2014]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://vpower.com.sg/?p=663</guid>
		<description><![CDATA[<p>Vpower Solutions is pleased to offer software training sessions for ETAP, e-DPP, EMTP and others; Sessions will be held at Singapore, Indonesia, Malaysia and Thailand.  Our programs are also available as an internal training.</p>
<p>The post <a rel="nofollow" href="https://vpower.com.sg/news/2014-software-training/">Software Training 2013 &#038; 2014</a> appeared first on <a rel="nofollow" href="https://vpower.com.sg">VPower Solutions</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p>Vpower Solutions is pleased to offer software training sessions for ETAP, e-DPP, EMTP and others; Sessions will be held at Singapore, Indonesia, Malaysia and Thailand.  Our programs are also available as an internal training.<br />

<a href='https://vpower.com.sg/?attachment_id=373'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-25-27-Jun-2013-Singapore-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (25-27, Jun 2013) Singapore" /></a>
<a href='https://vpower.com.sg/?attachment_id=374'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-27-30-Sept-2011-Singapore-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (27-30, Sept 2011) Singapore" /></a>
<a href='https://vpower.com.sg/?attachment_id=375'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-25-29-May-2009-Singapore-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (25-29, May 2009) Singapore" /></a>
<a href='https://vpower.com.sg/?attachment_id=376'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-24-27-Sept-2013-Singapore-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (24-27, Sept 2013) Singapore" /></a>
<a href='https://vpower.com.sg/?attachment_id=377'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-23-26-Apr-2007-Thailand-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (23-26, Apr 2007) Thailand" /></a>
<a href='https://vpower.com.sg/?attachment_id=378'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-22-25-May-2012-Thailand-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (22-25, May 2012) Thailand" /></a>
<a href='https://vpower.com.sg/?attachment_id=379'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-21-24-Feb-2012-Malaysia-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (21-24, Feb 2012)  Malaysia" /></a>
<a href='https://vpower.com.sg/?attachment_id=380'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-20-23-Nov-2012-Malaysia-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (20-23, Nov 2012) Malaysia" /></a>
<a href='https://vpower.com.sg/?attachment_id=381'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-19-21-Jan-2010-Thailand-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (19-21, Jan 2010) Thailand" /></a>
<a href='https://vpower.com.sg/?attachment_id=382'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-15-17-Jun-2010-Malaysia-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (15-17, Jun 2010) Malaysia" /></a>
<a href='https://vpower.com.sg/?attachment_id=383'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-7-10-May-2012-Singapore-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (7-10, May 2012) Singapore" /></a>
<a href='https://vpower.com.sg/?attachment_id=384'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-6-9-Dec-2011-Malaysia-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop (6-9, Dec 2011) Malaysia" /></a>
<a href='https://vpower.com.sg/?attachment_id=418'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-Indonesia-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop Indonesia" /></a>
<a href='https://vpower.com.sg/?attachment_id=415'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ETAP-Workshop-from-24-28-May-2010-at-Singapore-200x150.jpg" class="attachment-gallery-size" alt="ETAP Workshop from 24-28, May 2010 at Singapore" /></a>
<a href='https://vpower.com.sg/?attachment_id=461'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/03/IMG_0212-200x150.jpg" class="attachment-gallery-size" alt="IMG_0212" /></a>
<a href='https://vpower.com.sg/?attachment_id=478'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/Work-April-photo-200x150.jpg" class="attachment-gallery-size" alt="Work April photo" /></a>
<a href='https://vpower.com.sg/?attachment_id=482'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/IMG_0848-200x150.jpg" class="attachment-gallery-size" alt="IMG_0848" /></a>
<a href='https://vpower.com.sg/?attachment_id=483'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/index-200x150.jpg" class="attachment-gallery-size" alt="index" /></a>
<a href='https://vpower.com.sg/?attachment_id=486'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/ppt-200x150.jpg" class="attachment-gallery-size" alt="ppt" /></a>
<a href='https://vpower.com.sg/?attachment_id=494'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/albert-1-200x150.jpg" class="attachment-gallery-size" alt="albert 1" /></a>
<a href='https://vpower.com.sg/?attachment_id=496'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/photo-1-200x150.jpg" class="attachment-gallery-size" alt="photo 1" /></a>
<a href='https://vpower.com.sg/?attachment_id=497'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/photo-2-200x150.jpg" class="attachment-gallery-size" alt="photo 2" /></a>
<a href='https://vpower.com.sg/?attachment_id=500'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2014/01/vietnam1-200x150.jpg" class="attachment-gallery-size" alt="vietnam1" /></a>
<a href='https://vpower.com.sg/news/2014-software-training/attachment/etap-workshop-indonesia-1-002/'><img width="200" height="150" src="http://vpower.com.sg/wp-content/uploads/2016/09/ETAP-Workshop-Indonesia-1-002-200x150.jpg" class="attachment-gallery-size" alt="etap-workshop-indonesia-1-002" /></a>
</p>
<p>The post <a rel="nofollow" href="https://vpower.com.sg/news/2014-software-training/">Software Training 2013 &#038; 2014</a> appeared first on <a rel="nofollow" href="https://vpower.com.sg">VPower Solutions</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://vpower.com.sg/news/2014-software-training/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Electrical System Modeling and Analyse Projects Reference</title>
		<link>https://vpower.com.sg/news/2014-electrical-system-modeling-analyse-projects-reference/</link>
		<comments>https://vpower.com.sg/news/2014-electrical-system-modeling-analyse-projects-reference/#comments</comments>
		<pubDate>Sun, 12 Jan 2014 06:21:57 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[2014]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://vpower.com.sg/?p=646</guid>
		<description><![CDATA[<p>Vpower Solutions is pleased to offer conceptual design, feasibility studies, system modeling and analyse various design possibilities, we perform a full spectrum of power systems analysis. &#160; Project/Client Name Electrical System Study Rohm and Haas Chemicals (S) Pte Ltd (Plant at Jurong Island) Load Flow, Short-Circuit, Protective Devices and Arc Flash DF21 Data Center Load [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://vpower.com.sg/news/2014-electrical-system-modeling-analyse-projects-reference/">Electrical System Modeling and Analyse Projects Reference</a> appeared first on <a rel="nofollow" href="https://vpower.com.sg">VPower Solutions</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p>Vpower Solutions is pleased to offer conceptual design, feasibility studies, system modeling and analyse various design possibilities, we perform a full spectrum of power systems analysis.</p>
<p>&nbsp;</p>
<table width="906" border="0" cellspacing="0" cellpadding="0">
<colgroup>
<col width="463" />
<col width="432" /></colgroup>
<tbody>
<tr>
<td style="text-align: center;" width="463" height="20"><strong>Project/Client Name</strong></td>
<td style="text-align: center;" width="432"><strong>Electrical System Study</strong></td>
</tr>
<tr>
<td style="text-align: center;" height="20">Rohm and Haas Chemicals (S) Pte Ltd (Plant at Jurong Island)</td>
<td style="text-align: center;">Load Flow, Short-Circuit, Protective Devices and Arc Flash</td>
</tr>
<tr>
<td style="text-align: center;" height="20">DF21 Data Center</td>
<td style="text-align: center;">Load Flow, Short-Circuit, Protective Devices, Transformer Energization, Motor Starting, Transformer Inrush, Transient Fault, Cable Sizing and Arc Flash</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Singapore Oxygen Air Liquide Pte Ltd (J9 Plant at Jurong Island)</td>
<td style="text-align: center;">Load Flow, Short-Circuit, Motor Starting, Protective Devices, Harmonics</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Johor River Waterworks (PUB Project)</td>
<td style="text-align: center;">Load Flow, Short-Circuit, Motor Starting and Protective Devices</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Singapore Refining Company Pte Ltd (Plant at Jurong Island)</td>
<td style="text-align: center;">System Modeling</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Global Process Systems Pte Ltd (FPSO Project)</td>
<td style="text-align: center;">System Study &amp; Review</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Punggol-Serangoon Pumping Station (PUB Project)</td>
<td style="text-align: center;">Motor Starting</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Marina Bay Sands Singapore (IR Project)</td>
<td style="text-align: center;">Short-Circuit and Protective Devices</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Combining LEX and PROCESS Generators Study at Santan Terminal</td>
<td style="text-align: center;">Load Flow, Short-Circuit, Protective Devices and Transient Stability</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Marina Barrage Project at Marina Way/South (PUB Project)</td>
<td style="text-align: center;">Motor Starting</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Saudi Aramco Energy Centre</td>
<td style="text-align: center;">Load Flow, Short-Circuit and Motor Starting</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Equinix Singapore Data Center</td>
<td style="text-align: center;">Transformer Energization Study</td>
</tr>
<tr>
<td style="text-align: center;" height="20">Kingsland Data Center</td>
<td style="text-align: center;">Short-Circuit and Protective Devices</td>
</tr>
</tbody>
</table>
<p>The post <a rel="nofollow" href="https://vpower.com.sg/news/2014-electrical-system-modeling-analyse-projects-reference/">Electrical System Modeling and Analyse Projects Reference</a> appeared first on <a rel="nofollow" href="https://vpower.com.sg">VPower Solutions</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://vpower.com.sg/news/2014-electrical-system-modeling-analyse-projects-reference/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>ETAP Real-Time Solutions Project Experience</title>
		<link>https://vpower.com.sg/news/2014-etap-real-time-solutions-project-experience/</link>
		<comments>https://vpower.com.sg/news/2014-etap-real-time-solutions-project-experience/#comments</comments>
		<pubDate>Sun, 12 Jan 2014 06:13:29 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[2014]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://vpower.com.sg/?p=641</guid>
		<description><![CDATA[<p>ETAP Real-Time is a suite of software tools that offers a fully integrated enterprise solution. VPower Solutions acting as the Local Site Support for the ETAP Real-Time Solutions Projects in Singapore and Indonesia.            Problem Production losses due to faults caused by a variety of environmental disturbances Need a system to help [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://vpower.com.sg/news/2014-etap-real-time-solutions-project-experience/">ETAP Real-Time Solutions Project Experience</a> appeared first on <a rel="nofollow" href="https://vpower.com.sg">VPower Solutions</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p>ETAP Real-Time is a suite of software tools that offers a fully integrated enterprise solution.</p>
<p>VPower Solutions acting as the Local Site Support for the ETAP Real-Time Solutions Projects in Singapore and Indonesia.</p>
<p><strong style="line-height: 1.5em;"><a href="http://vpower.com.sg/wp-content/uploads/2014/01/Newmont-Logo.png"><img class="alignright" alt="Newmont-Logo" src="http://vpower.com.sg/wp-content/uploads/2014/01/Newmont-Logo.png" width="150" height="68" /></a><a href="http://vpower.com.sg/wp-content/uploads/2014/01/Newmont-1.jpg"><img alt="Newmont-1" src="http://vpower.com.sg/wp-content/uploads/2014/01/Newmont-1.jpg" width="225" height="150" /></a>          <a href="http://vpower.com.sg/wp-content/uploads/2014/01/Newmont-2.jpg"><img alt="Newmont-2" src="http://vpower.com.sg/wp-content/uploads/2014/01/Newmont-2.jpg" width="225" height="150" /></a></strong></p>
<p><strong>Problem</strong></p>
<ul>
<li>Production losses due to faults caused by a variety of environmental disturbances</li>
<li>Need a system to help optimize electrical power management resulting in lower generation costs and fewer process time losses due to unnecessary load tripping</li>
</ul>
<p><strong>Solution: ETAP Real-Time</strong></p>
<ul>
<li>ETAP PSMS was installed to provide monitoring and display parameters of electrical power distribution and power generation systems</li>
<li>ETAP PSMS is also used to perform calculations to establish efficient operations and predict the effect of changes to these systems</li>
</ul>
<p><strong>Benefits</strong></p>
<ul>
<li>ETAP Intelligent Load Shedding (ILS) recognized problems within the system and prompted the proper shedding of MW based on the customer preferences</li>
<li>ETAP ILS enabled operations to remain stable much to the satisfaction of PT Newmont senior executives</li>
</ul>
<p>&nbsp;</p>
<p><strong><a href="http://vpower.com.sg/wp-content/uploads/2014/01/OMV-Logo.png"><img class="alignright" alt="OMV-Logo" src="http://vpower.com.sg/wp-content/uploads/2014/01/OMV-Logo.png" width="150" height="106" /></a><a href="http://vpower.com.sg/wp-content/uploads/2014/01/OMV-1.jpg"><img alt="OMV-1" src="http://vpower.com.sg/wp-content/uploads/2014/01/OMV-1.jpg" width="226" height="150" /></a>          <a href="http://vpower.com.sg/wp-content/uploads/2014/01/OMV-2.jpg"><img alt="OMV-2" src="http://vpower.com.sg/wp-content/uploads/2014/01/OMV-2.jpg" width="338" height="150" /></a></strong></p>
<p><strong>Problem</strong></p>
<ul>
<li>Lacked generation monitoring and control systems</li>
<li>The RAROA vessel had no system that could successfully handle overloads and generator trips</li>
</ul>
<p><strong>Solution: ETAP Intelligent Load Shedding (ILS)</strong></p>
<ul>
<li>Flexibility of customizations</li>
<li>Simulation and analysis capabilities</li>
<li>Complete PMS Solution (Gen control, ILS, and PSMS Capabilities)</li>
<li>Interfaced with all devices selected for this project</li>
</ul>
<p><strong>Results</strong></p>
<ul>
<li>Addressed sudden losses of generation</li>
<li>Setup 21 load shedding loads</li>
<li>Response time measured at about 40 ms from trigger detection for steam pressure and gen trips</li>
<li>10.1 sec. response to overloads (User Defined)</li>
</ul>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><strong><a href="http://vpower.com.sg/wp-content/uploads/2014/01/SLNG-Logo.png"><img class="alignright" alt="SLNG-Logo" src="http://vpower.com.sg/wp-content/uploads/2014/01/SLNG-Logo.png" width="150" height="44" /></a><a href="http://vpower.com.sg/wp-content/uploads/2014/01/SLNG-1.jpg"><img alt="SLNG-1" src="http://vpower.com.sg/wp-content/uploads/2014/01/SLNG-1.jpg" width="283" height="150" /></a>          <a href="http://vpower.com.sg/wp-content/uploads/2014/01/SLNG-2.jpg"><img alt="SLNG-2" src="http://vpower.com.sg/wp-content/uploads/2014/01/SLNG-2.jpg" width="250" height="150" /></a></strong></p>
<p><strong>Problem</strong></p>
<ul>
<li>Accounting for the amount of energy usage within SLNG’s facilities</li>
<li>Lacking any structure for predictive simulation and playback of daily operations</li>
</ul>
<p><strong>ETAP Intelligent Load Shedding (ILS)</strong></p>
<ul>
<li>ETAP implemented Real-Time Alarming and Event Viewers</li>
<li>ETAP Playbacks, Trending, and Archived Reports were utilized</li>
<li>The groundwork for ETAP ILS was executed</li>
</ul>
<p><strong>Results</strong></p>
<ul>
<li>Provided communications to over 100 different devices</li>
<li>Integrated with Distributed Control and Information System</li>
<li>ETAP Real-Time solved SLNG’s issues with predictive simulation and energy accounting</li>
</ul>
<p>The post <a rel="nofollow" href="https://vpower.com.sg/news/2014-etap-real-time-solutions-project-experience/">ETAP Real-Time Solutions Project Experience</a> appeared first on <a rel="nofollow" href="https://vpower.com.sg">VPower Solutions</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://vpower.com.sg/news/2014-etap-real-time-solutions-project-experience/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
